Define composition and construction
Record fibre requirements and the construction or reference basis. Mark mandatory values and flexible directions separately. Give known technical values their units and source. Avoid turning a category name or a sample’s appearance into a confirmed composition.
State weight with a clear unit
Use GSM for mass per area or identify grams per linear metre explicitly. Converting a linear weight to GSM requires a stated width in metres. Keep the original value and width basis visible. An unknown width prevents a reliable conversion; it should not become zero.
Separate usable and total width
State which width the garment’s cutting plan requires. Record units, measurement conditions and any excluded edge area. A total-width figure is not automatically usable width. Ask for the finished value and tolerance needed for the actual delivery specification.
Include methods and tolerances
Keep method, conditions and acceptance range in dedicated fields. Ask for missing details to be agreed. A target without a method or condition may be difficult to compare with a later report. Do not add a remembered standard number or an assumed pass level.
Control the specification revision
Give the sheet a project ID and revision and link the approved sample. Record the source of each factory-confirmed value. When a property changes, issue a revised sheet and review affected approvals. Preserve the older version so the next recipient can see what changed.
Resolve a specification that looks complete but is not comparable
A sheet may include composition, weight and width while leaving their meanings ambiguous. Check whether weight is GSM or grams per linear metre, whether width is total or usable and whether values apply to the accepted finished state. Identify which figures are targets and which are confirmed.
For a test requirement, include the intended method, conditions and acceptance basis agreed by the buyer. Do not borrow a generic grade from a website or leave a test name without a decision threshold. A complete-looking table can still produce incomparable quotations if its units and scope are missing.
Use a controlled target and confirmation comparison
Keep the original target in one column and the factory proposal or confirmed value in another. Add the evidence reference and the reviewer’s decision. If a proposal does not meet the target, record an exception or requested revision rather than overwriting the requirement.
This is especially important when a garment trial leads to a revised article. Ask which earlier values remain valid and which need remeasurement or review. The accepted specification should belong to the identified sample revision, not to an accumulation of unlinked values from earlier discussions.
Separate the fabric target, supplier proposal and accepted value
Use distinct fields for what the buyer wants, what the supplier proposes and what the team has accepted. A target value should not become an established result merely because it appears in a completed spreadsheet. Give every material field its unit, relevant sample state and basis of confirmation. Where a range or permitted difference is required, identify who agrees it for the actual article and assessment. This guide does not supply a universal tolerance that can replace that agreement.
Keep unknowns and provisional values visible. Ask the supplier to respond explicitly to an unresolved composition, usable width or other requirement rather than copying the target into the response. When evidence arrives, retain its identity and the decision that changes the status. If the accepted proposal differs from the original target, record that choice instead of altering the old request without explanation. A specification that distinguishes these stages helps purchasing compare offers and helps the garment factory understand what has actually been confirmed.
Name the sample state and method behind each measured specification
A value is easier to interpret when the record says what material was measured and under which relevant conditions. Identify the article, revision, colour or lot where needed, and the stage represented by the specimen. Keep the method, unit and any stated laboratory limitation with the result. Measurements of a flat fabric, an assembled component and material after a care process can answer different questions. Do not present them as interchangeable simply because the same attribute name appears in the report.
When results differ, reconcile the bases before assigning a failure or choosing a preferred number. Ask whether the preparation, dimensions, processing history and measured component are comparable. Retain the original reports and explain any conversion or corrected entry. If the method is not appropriate to the material or claim, ask the responsible technical party for a suitable approach. The purpose is to make the acceptance requirement usable, not to fill every specification cell with a number that lacks a dependable connection to the actual cloth.
Write colour, direction and component requirements so cutting can apply them
Connect the specification to the accepted physical reference and name the selected fabric face and garment-top direction where appearance requires it. State the intended colour scope and how production lots or shade groups will be identified. If a motif must match at a seam or pocket, retain the relevant garment decision. A generic description such as matching colour is not enough for the cutting team to know whether panels from different rolls may be combined or turned.
Ask the garment factory to check the specification against its actual layout and making plan. Keep usable width separate from total width and identify the quantity basis used for consumption. Record any approved exception by location and material scope. When an article or direction changes, revisit the affected instructions rather than forwarding the old technical sheet with a new fabric name. The final record should allow the people handling the cloth to identify the accepted arrangement without reconstructing design choices from a collection of unlabelled sample pieces.
Control specification revisions through their affected decisions
Give the current specification a clear revision identity and record why a field changed. Identify the physical samples, quotations, garment assessments and order documents that depend on that field. A new usable width can affect consumption; another finish can affect appearance or making; a revised composition can affect the material claim. The responsible team should decide which evidence needs review. Do not assume a small text edit is harmless when it changes the material basis used by other people.
Send the revised requirement with its change summary and keep the earlier version as history. Ask recipients to identify any proposal or document that still uses the superseded basis. Record the approvals that remain applicable and those that need a new decision. If the order is already in progress, reconcile the actual material and stage before treating the revised sheet as a retrospective description. A controlled revision is more useful than a pristine final spreadsheet that conceals which requirements changed and whether the relevant supplier and garment teams accepted them.
Illustrative unit error: 600 grams is not automatically 600 GSM
Assume a hypothetical finished fabric weighs 600 grams per linear metre and the stated conversion width is 1.50 metres. Dividing 600 by 1.50 gives 400 grams per square metre. The original linear-weight figure should remain visible alongside the calculated area weight.
If the conversion width is unknown, leave the conversion unresolved instead of assuming it. Distinguish the measured width basis from the usable cutting width. This example is arithmetic only; it does not specify an available article, a measurement method or an acceptance tolerance.
Release one specification revision to all teams
Give the sheet an article ID, revision and date. Identify the reference sample and the approvals or reports that support it. Keep unresolved points with owners and decisions required before commitment.
Send the same accepted revision into the RFQ, garment trial, order handover and inspection request. If a later change is authorised, update the affected records and state what has been superseded. A controlled specification prevents the sourcing team quoting one width while the garment factory cuts against another.
Prepare the next decision
| Input | Decision to make | Record to keep |
|---|---|---|
| Composition | Target and confirmed values | Source record |
| Weight | GSM or linear weight with width basis | Unit record |
| Width | Finished usable width | Measurement conditions |
| Acceptance | Method and tolerance | Agreed plan |
| Revision | Sample and confirmation links | Current sheet |
Questions for this stage
Can the tool confirm a value?
No. A confirmed column needs an identified factory communication or document. Buyer-entered values without that evidence remain targets.
How is linear weight converted?
GSM equals grams per linear metre divided by the stated width in metres. Record the width basis and retain the original requirement.
Should an unknown tolerance be entered as zero?
No. Leave it open and ask for the applicable tolerance and measurement conditions.
Must every specification field be filled before development starts?
No. Mark unknown fields clearly and identify how they will be resolved. The important distinction is between an open question, a buyer target and an evidence-backed confirmation.
What makes a tolerance usable?
It must be agreed for the relevant property and measurement basis, with a clear decision rule. Do not create a tolerance simply to complete the worksheet; request the buyer and factory confirmation required for the article.
Can I use one tolerance for every fabric property in the specification?
Agree each relevant requirement with the responsible parties for the actual article, method, unit and use. A permitted difference for one measurement does not automatically establish an acceptance rule for another property or process stage. Keep targets, proposed values and accepted values distinct, and retain the basis of any agreed range. Do not use a convenient default to turn an unresolved requirement into an apparent supplier commitment or laboratory conclusion.
What should be entered when a supplier has not confirmed usable width?
Mark the usable width as pending and retain any separately stated total or nominal width with its own meaning. Ask the supplier for the proposed usable basis and have the cutting team check the affected layout when that information is available. Do not enter zero or copy another width merely to complete the form. Keep any related consumption or quotation comparison provisional until the missing basis can be reconciled.
Does a new specification revision automatically approve material already produced?
No. Identify which material and stage the revision is intended to cover, then review the affected evidence and decisions with the responsible parties. Preserve the original requirements and the actual production records. A newly edited sheet should not retrospectively describe unreviewed material as accepted. Record whether the change applies to further development, a defined production proposal or another limited scope, and retain any unresolved commercial or technical questions.