Fabric Approval Checklist: Samples and Pending Decisions

Use one worksheet to identify the samples reviewed across development and bulk stages. Keep the decision scope and remaining points with each sample ID. The file is a buyer preparation record and should travel with the current specification and retained standard.

Editable worksheets

CSV files are editable working records. A blank field is an open decision, not an approved value.

Name each stage

Separate direction reference, colour, garment-trial metreage, production standard and bulk inspection. Each answers a different question.

Identify the sample

Record sample ID and revision. Use the physical standard’s actual identity, not only a descriptive colour or category.

Record reviewed points

State the specific appearance, garment or specification decisions reviewed and name the reviewer. Keep the date and supporting record available.

Keep open points

List unresolved tests, dimensions, scope or commercial questions. An exported checklist can remain incomplete as long as the missing gates are visible.

Carry the release record

Use the applicable written authorisation for factory or contractual release. A buyer checkbox does not provide that authority. Preserve the current standard and change history with the final order.

Write a decision another reviewer can understand

Use the sample ID and revision, identify the stage and name the decision owner. List exactly what was reviewed rather than writing approved without scope. Keep unreviewed requirements in the open-points field.

A preliminary image review, physical colour decision and garment trial are different evidence stages. Label them correctly so a later handover does not treat one as a substitute for another. The worksheet records the buyer’s stated decision; it does not verify the underlying evidence.

Handle a revised sample as a new review

When the article changes, identify which earlier decisions may be affected. Give the new sample its own revision and retain the previous record. Ask the responsible reviewers to confirm the scope that remains valid.

Do not copy every accepted attribute into the new row without checking its applicability. A revised finish can require renewed visual or measurement review. The actual affected requirements determine the next evidence needed.

Reconcile approvals before bulk handover

Compare the recorded decisions with the final article and specification. Resolve approvals that refer to incompatible samples or unidentified stages. Keep remaining release items with owners.

Retain the accepted checklist with the order handover and relevant reports. A complete approval file should show which material and attributes were accepted, not merely contain a sequence of positive replies.

Prepare the next decision

Fabric Approval Checklist: Samples and Pending Decisions
InputDecision to makeRecord to keep
StageDistinct sample purposeGate record
IdentityID and revisionPhysical sample
ReviewOwner and scopeBuyer decision
OpenUnresolved requirementsNext-action list
ReleaseApplicable authorisationOrder record

Questions for this stage

Can the file say factory approved from a checkbox?

No. Buyer review status and actual factory authorisation remain separate.

Should an old sample stay in the file?

Retain its identity as superseded evidence and clearly identify the current standard.

Can I export before every gate is complete?

Yes. Keep the draft, pending and open stages visible.

What does buyer reviewed mean in the template?

It states the buyer’s recorded review scope. It is not factory approval, order acceptance or proof that all other requirements have been met.

Can I keep several rows for one article?

Yes. Use separate sample stages or decisions with clear IDs and revisions. Identify the final controlling reference so the history does not leave bulk approval ambiguous.

Move the project forward

Approval checklist

Final specifications, sample availability and commercial terms are confirmed for the actual project.

Approval checklist ↗