Start with the garment
Name the end use and the fabric qualities it needs. For example, a jacket brief can identify drape, surface and pressing questions without inventing an article specification.
Keep unknown fields open
Leave unconfirmed composition, GSM, width or tolerances blank and add a question. Empty information is not a zero value or a statement that any specification is acceptable.
List each colour
Enter each colour reference and quantity with units. Mark the status as forecast, trial or intended order. Ask for quantity conditions against the actual article.
Index attachments
Give photographs and specifications stable reference IDs. Identify face, reverse and the property each illustrates. Add physical-dispatch instructions only after the receiving details are agreed.
Send the current revision
Review the CSV or build an English brief in the tool. Include project ID, revision and open questions in the message. Attach your files in your own email or WhatsApp application and send it yourself.
Fill the request without inventing missing values
Identify the garment, project and reference first. Add known composition, weight, usable width, quantities by colour, sample need, destination and required assessment. Explain unknowns in the notes rather than supplying an assumed default.
Mark the actual request stage: exploration, development, sample or bulk. A template is useful when it tells the recipient which answer the buyer needs next. The article does not become order-ready merely because the row is complete.
Write a fabric RFQ that distinguishes the requirement from the reference
A reference sample can show what the buyer likes without defining every requirement of the new order. In the RFQ, identify which features should be followed and which should be changed. The buyer may want the surface appearance of the reference, a different weight, another fibre blend or a revised colour. List those intentions separately. If the sample has unknown composition or no reliable measurement record, state that rather than filling the template with inferred values. Ask the supplier to propose an identified material and explain the relevant differences. This makes the response reviewable and avoids a later argument about whether matching the reference meant matching its appearance, its construction or an unsupported technical assumption.
Include the garment use and the first decision the quotation should support. A request for a development sample differs from a request to price a fully specified repeat order. When the buyer needs a development route, ask for sampling options and the information required to narrow them. When the material is already defined, attach the current specification and approval references, then ask the supplier to identify any exceptions. Keep fixed requirements, preferences and unknowns distinguishable. A concise requirement with an open question can be answered; an overloaded description combining contradictory targets may generate a price that appears responsive while leaving the actual fabric proposal uncertain.
Build a colour and quantity schedule that exposes minimum-order questions
Show each requested colour with its own reference, immediate quantity and status. Keep a future forecast separate from an authorised order quantity. If colour allocation is undecided, describe the total as provisional and ask what information the supplier needs to discuss production and colour minimums. Do not divide a total forecast equally across colours unless that is the buyer's actual plan. Identify whether samples are needed before the allocation can be confirmed. A clear schedule lets the supplier explain the relationship between sampling, colour development and commercial production, rather than responding to one large total that hides several small colour requirements.
An illustrative request might involve one main colour with a planned production quantity and two accent colours awaiting customer review. Give those statuses plainly and ask for separate proposed conditions where appropriate. If a supplier offers an alternative minimum or a stock-material route, record the exact fabric and colour identity and the differences from the request. Do not treat a stock alternative as the same material merely because its description is similar. Update the schedule after the buyer reviews the options. The RFQ should preserve which quantities were requested, which were proposed and which were later agreed, so the eventual order handover does not inherit an obsolete colour split.
Use an attachment index to prevent a quotation against the wrong revision
List the attachments by identifier, revision and purpose. A colour image, physical-sample photograph, laboratory report and garment sketch answer different questions. Identify which document contains the current requirement and which is background reference. When a file is replaced, mark the earlier version as superseded in the revised index rather than sending another unexplained attachment. Ask the supplier to confirm the fabric and specification revision used for the proposal. A price without that link may be impossible to compare with another offer or to carry into an order. The template cannot verify that attachments were transmitted or opened, so retain the actual communication and response through the channel used by the project.
Suppose the first RFQ includes a 400 GSM target and a later revision asks for a lighter material after a collar trial. Send a short change summary alongside the revised attachment index, identifying the target as a buyer request and describing the trial evidence. Ask whether the supplier's new price and sample proposal correspond to that revision. Keep the original response for history, but do not let its sample code or date become the default reference in the new quotation. Before comparing offers, check that each recipient answered the same current request or clearly listed its alternative. This small reconciliation often prevents more confusion than adding further descriptive text to the RFQ itself.
Ask for an actionable reply and review it before requesting an order
End the request with the response needed: material identity, proposed specification, sampling route, colour and quantity conditions, quotation scope, timing assumptions and unresolved exceptions. Only request information relevant to the project stage. Avoid presenting a desired delivery date as a supplier promise. Ask which approvals or inputs the proposed schedule depends on and what date the supplier considers meaningful, such as sample readiness, production completion or a specified logistics event. Keep those meanings with the response. If the request involves tests or certification evidence, identify the relevant material and document scope without suggesting that a general company statement proves the proposed product is covered.
Review the reply line by line against the RFQ before moving to a purchase discussion. Ask for clarification where a proposed alternative changes the garment requirement, quantity basis or evidence needed. If a key question is unanswered, keep it open and identify the next responsible action. After the buyer accepts a proposal for further development, use the specification sheet and approval tracker to record what still needs review. For current supplier discussion, send the reviewed request through the official Fred Textile contact route and retain the received confirmation. Neither downloading the template nor completing its cells sends an enquiry, reserves a material or establishes agreed order conditions.
Close the RFQ clarification loop before using the returned price
After several messages, prepare a short reconciliation listing the current material request, colour quantities, specification revision and unanswered questions. Ask the supplier to identify which proposal and price correspond to that set. Keep alternatives separately labelled. A conversation can appear settled while the price still refers to an earlier quantity or a sample with another finish. The RFQ index should make that mismatch visible before purchasing copies the number into an order plan.
In a hypothetical case, the buyer changes from two colours to three after receiving the first quotation. Keep the earlier price as history and request confirmation of the new colour allocation and related conditions. Do not multiply the old price by the new total and call it a confirmed offer. Once the response is reviewed, carry the accepted proposal identity into the specification and approval records. This turns a long message thread into a clear next step without pretending that the template itself establishes agreement.
Review quantity and date meanings
Keep quantity units explicit and show the colour distribution. Label whether a target date concerns sample review, production, dispatch or receiving. Those distinctions affect the proposal assumptions.
Ask the response to state the actual commercial scope and any deviations. Preserve the original buyer requirement when a different value is proposed. This lets sourcing compare the reply without losing what was requested.
Use the template through the clarification cycle
Keep the project and revision in the filename and message. When clarification changes a requirement, record a revision and identify the affected fields. Retain earlier responses as history rather than merging incompatible terms into the current row.
Transfer a coherent accepted direction to the specification and quotation records. The RFQ worksheet is a communication aid; the actual quotation and order process establishes the commercial commitment.
Prepare the next decision
| Input | Decision to make | Record to keep |
|---|---|---|
| Garment | End use and qualities | Brief opening |
| Unknown | Blank plus question | Open-item list |
| Colours | Each quantity with units | Quantity table |
| Attachments | IDs and purpose | Evidence index |
| Revision | Current project version | Reviewed message |
Questions for this stage
Can I submit the file on this site?
This release provides local preparation and contact links. Attach and send the worksheet through your own communication application.
Should a target be marked confirmed?
Only when an identified factory reply or document confirms it.
Can a quantity forecast be included?
Yes. Mark its planning status clearly and ask for the applicable conditions.
Can I send the template before choosing a fabric?
Yes, as an exploration or development request with the garment, mandatory constraints and open points clearly stated. Ask for a suitable sample direction and proposal assumptions.
What should I do with a changed supplier proposal?
Keep it separate from the original target, record the deviation and ask the responsible buyer whether it is acceptable. Update the requirement only through the actual decision process.
How should an RFQ describe a sample that is only an appearance reference?
Identify the physical sample or image and state which visible characteristics it represents. Mark unknown technical values as unknown and list the new order requirements separately. Ask the supplier to identify the proposed material and explain its differences. A reference used for colour or texture should not silently become the source of a claimed fibre percentage, weight or certification. Review the returned sample against the actual intended garment before treating the proposal as accepted.
What is the best way to send a revised RFQ?
Issue a new revision with a short summary of the changed requirement, a current attachment index and the previous revision clearly identified as superseded for the new request. Ask the supplier to reference the revision in its response. Keep earlier correspondence for history. Before comparing prices or samples, check that every proposal addresses the same request or explicitly describes an alternative. A new filename alone may not explain what changed or which quotation remains applicable.
Which date should I ask the supplier to confirm?
Name the event you need to plan around and distinguish your requested date from the supplier's proposed date. Sampling completion, production readiness, collection and arrival are different events. Ask which approvals and inputs the proposed timing assumes, then retain those conditions with the response. Do not convert a general lead-time indication into a guaranteed arrival date. Reconcile the agreed event and its scope in the later order discussion with the responsible parties.